• Control and check documents (material, drawing, installation and method statement for testing)
• Inspection and update track record
• Make maintenance schedule for MEP service.
• Control and check (time, cost, equipment and resources…) required to complete the project
• Problem solving (PDCA)
• Machine maintenance and Master schedule maintenance
• Electronic and electrical wiring system
• Survey place for draw the new project of the building
• Check, Fix, Replace, Prepare and Clean all Electrical / Power System, Generator System , Power DC System, BTS System, MCW System, Generator every 250h, External alarm, Grounding System each of sites.
• Make request to order Fuel and Engine oil, spare part for Generator, Spare Part of DG
• Monitor and Installation Electrical, Power System like: Air Conditioner, ATS box, IPS box, AC box ext....Battery banks/cell Rectifier, Invert-er and Solar.
• Visit each of sites for checking all equipment as scheduled
• Make Daily, Weekly and Monthly Report on schedule for Preventive and Maintenance eve